Anchoring stationary
block, tied to drillpipe and buried. Traveling line pulled with dozer |
Traveling block
attachedd to rig substructure. Rig pulled to clear BOP stack |
Field move tires
attached after BOP Stack Cleared |
Oilfield trucks move
rig off location |