Rig Move

isba13a.jpg (3715 bytes)

isba14a.jpg (4681 bytes) isba16a.jpg (5559 bytes) isba15a.jpg (3686 bytes)

Anchoring stationary block, tied to drillpipe and buried.  Traveling line pulled with dozer

Traveling block attachedd to rig substructure.  Rig pulled to clear BOP stack

Field move tires attached after BOP Stack Cleared

Oilfield trucks move rig off location