Input Data

This chapter contains the scenario definitions and input data used for blowout and well kill simulations for hypothetical blowouts from one of the wells on the Alpha or Beta fields.

Casing and Tubing Program

Details of the planned well design for the wells on the two structures can be found in other parts of this contingency planning manual. Casing and drillpipe sizes are given in the table below. Note that since the blowout rates are mostly limited by the inflow performance, the blowout and kill rates are not highly sensitive to the lengths and diameters of the BHA.

Table -1: Casing-tubular design.

 

Density

OD

ID

 

kg/m

lb/ft

mm

inch

mm

inch

Surface

   

914.4

36

   

Surface

   

762

30

   

18-5/8 J-55

130.2

87.49

473.1

18.626

   

13-3/8 J-55

101.2

68.00

346.1

13.626

315.3

12.413

10-3/4 C-110

126.94

85.30

273

10.748

   

9-7/8 C-110

93.45

62.80

250.8

9.874

   

9-7/8 P-110

93.45

62.80

250.8

9.874

   

5-1/2 tubing

34.2

22.98

139.7

5.500

118.6

4.669

7" liner

56.55

38.00

177.8

7.000

150.4

5.921

4.5 " tubing

24.7

16.60

114

4.488

150.4

5.921