Management of Technology
Through specific blowout contingency plans we attempt to identify potential well control hazards that may pertain to the technology used or available, e.g.: well construction, equipment, or procedures that are being used or planned for a particular project. In blowout recovery we attempt to identify any technology problems that may be encountered while attempting to regain control of a blowout (e.g. subsea blowout in deepwater, high flowrate wells with large diameter tubulars, shallow craters, high temperatures, relief wells without a steel target to home-in on, etc.).