Sequence of pictures taken of the fire during the kill pumping operations

 

isba_kil_seq_2a.jpg (3864 bytes)

isba_kil_seq_1a.jpg (4100 bytes)

isba_kil_seq_3a.jpg (2844 bytes)

isba_kil_seq_4a.jpg (3362 bytes)

Just before Pumping Water started in RW1 Water rate @ 120 bpm Building Pressure

isba_kil_seq_5a.jpg (4187 bytes)

isba_kil_seq_8a.jpg (3620 bytes)

isba_kil_seq_6a.jpg (4154 bytes)

isba_kil_seq_7a.jpg (3522 bytes)

Building Pressure Building Pressure

Well Dead

Blowout BOP Stack